Empowering Communities of Environmental Health and Safety/Sustainability Professionals

Multi-year Asbestos and Lead Project

Home » Case Study, Occupational Health and Safety
30 October 2008 No Comment

Clark Seif Clark, Inc.


CSC manages this multi-year (2000-2003), $200,000/year, asbestos and lead project for the DOT. Work entails pre-demolition surveys. The project is comprised of conducting asbestos and lead surveys on properties that are scheduled for demolition.


The scope of work includes collecting samples of suspect asbestos-containing materials, perform XRF lead-based paint surveys, and generate both asbestos and lead-based paint reports. The reports must include: a) area of property surveyed and quantities of each material, b) detailed description of each property, c) methods used in performing the analysis, d) a list of asbestos and lead-based paint materials, e) laboratory result sheets, f) drawings that shows sample locations, and g) conclusion and recommendations.

Leave your response!

Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.

Be nice. Keep it clean. Stay on topic. No spam.

You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

This is a Gravatar-enabled weblog. To get your own globally-recognized-avatar, please register at Gravatar.